Mimosa Concentrator Plant Optimisation Project

We are currently participating in the ongoing project at the Mimosa Concentrator Plant where we are doing all of the electrical and instrumentation installations. The project is likely to stretch until the end of April this year, having begun last year in September.

image 1 image 2 image 3

Ngezi Third Concentrator Plant (2022)

In the past year, for the last half of the year, we took part in the Third Concentrator Plant Expansion Project that took place at ZimPlats in Ngezi. This project stretched from June until December 2022. We also performed the tasks of doing all of the electrical and instrumentation installations at the site. We completed the project well within the stipulated time period and this resulted in the customer being very satisfied with the services we provided.

image 1 image 2 image 3 image 3 image 3 image 3

PPC Colleen Bawn

In 2022, we undertook a project at the PPC Colleen Bawn Village where we did the installations and replacements of single phase meter boards, weather dec cables as well as single phase prepaid meters. This was for a total of 435 Houses and we managed to complete the project in an impressive three weeks!

image 1 image 2

Thor Developments Kitwe, Zambia

The main project was the Construction of BELL CSC- TYPE A facility. The supply and Installations of main board and distribution board with switchgear were done. Complete lighting installations and electrical installations for Low Voltage metering were among the tasks of the project which Star Delta accomplished in 8 weeks.

Pamoja Mining Company LTD, Tanzania(2013)

Star Delta was proudly involved in the commissioning of the elution plant in Tanzania in conjunction with Mina Nawe Trading. Star Delta was allocated the responsibility to supply and install the generator supply panel and to supply and install the main MCC. Installation of water tanks and pumps supplied by the mine were also done by Star Delta. General lighting and electrical plant lighting was adequately supplied and installed on this project which took 3 weeks to complete.

Duvant Cotton Limited, Zambia (2013)

Among other projects over the years, we have been successful in Cotton Ginnery installations and relocations, Humid-air installations, Large generator installations, Power Factor Correction, PLC design and installations. This was one such project which took 4 months to complete.

image 1 image 2 image 3 image 3 image 3 image 3 image 3 image 3

Nhimbe Fresh Export, Rokodzi Farm Marondera

The repair and installation of two main MCB Panels, supply and installation of an 800 Amp free standing panel, generator, transformer and general lighting at the farm. All the above mentioned tasks were the sole responsibility of Star Delta and were performed in a period of 6 Weeks, leaving a great impact.

Central Grain Company (Pvt) Ltd

The main project was the installation of a new Meat Processing Plant where the upgrading of a distribution board to 2000Amp and installation of a transformer was successfully carried out by Star Delta leaving nothing to be desired. The whole job lasted a period of 3 months.

image 1

Todal Mining

In 2011, the upgrade project of a 50KVA transformer to 350KVA was entrusted to Star Delta Electrix and was satisfactorily accomplished. The project encompassed installation of panels, metering installations and replacement of power lines and poles. It lasted for a total of 7 months.

image 1 image 2 image 3

Unki Platinum Mine

In 2010, we were proudly involved in all the "High Voltage", "Lighting", "Low Power" and all instrumentation installations at the new Anglo Platinum concentrator plant in Shurugwi, Zimbabwe, namely Unki Mine. Star Delta accomplished the project in conjunction with B & W Instrumentation and Electrical Limited of South Africa. Our successes in this project have put us in good stead in the current mining sector within the SADC region. The project lasted for 12 months.

image 1 image 2 image 3

Bulawayo City Council and Harare City Council

Star Delta was recently invited by the Bulawayo and Harare City councils to do presentations in power point, of the Baylan Prepaid Smart Water Meter project proposals and the product was proven to be of the highest quality. We proposed to, among other things:

• Supply Pre-paid Smart Water Meters • Supply Billing Platform Software for Pre-paid Smart Water Meters • Supply Point of Sale Machines • Install Pre-paid Smart Water Meters • Install and Integrate Billing Platform Software • Commission Pre-paid Smart Water Meters and Billing Platform Software • Train BCC and HCC staff

image 1 image 1